Minimize

Welcome!

Aztec Minerals – First Pass Drill Results From The Westside Target, Tombstone Project, Arizona: 85.4m of 47.31 gpt Silver Equivalent (AgEq), including 24.4m of 106.3 gpt AgEq

Cory
January 23, 2025

Simon Dyakowski, President and CEO of Aztec Minerals (TSX.V:AZT – OTCQB:AZZTF) joins me to recap the drill results from the first pass drilling at the Westside Target on the Tombstone Project in Arizona. Refer to Figure 1 from the news release, posted below, to see where the holes are located. 

 

Simon recaps the findings from holes 8 through 13, spread out throughout the Westside Target. The drilling aimed to test the company’s new geologic and 3D model developed over 2024. Key highlights include the results from hole 13, which returned a broad intersection of 85.4 meters of 47.3 g/t silver equivalent (AgEq), and a high-grade zone of 24.4m of 106.3 g/t AgEq. 

 

Simon also provides insights into the presence of old mine workings and discusses their strategic decisions and priorities for future drilling programs, including the systematic grid drilling planned for later this year. Simon addresses questions about the gold grades and explains the focus on anticlines over dikes in this initial phase. 

 

We conclude with an outlook on upcoming news and drilling results from the Southern Extension area.

 

Please email me any questions you have for Simon. My email address is Fleck@kereport.com

 

Click here to visit the Aztec Minerals website.

Leave a Reply

Your email address will not be published. Required fields are marked *