Minimize

Welcome!

Aztec Mineral – Tombstone Drill Results: Expanding Gold Mineralization At The Contention Main Zone, 1.02 g/t AuEq over 88.1m, including 5.93 g/t AuEq over 9.2m

Cory
January 14, 2025

Simon Dyakowski, President and CEO of Aztec Minerals (TSX.V:AZT – OTCQB:AZZTF) joins me to recap the latest round of drill results from the Tombstone Project in Arizona. Reference the drill plan map below to see where the 3 drill holes are located on the Project within the Contention Main Zone.

 

We start with a recap of the 3 holes within the news release with a focus on Hole 10, which intersected a high-grade zone of 9.2 meters of 5.93 g/t gold equivalent. We also discussed hole 7 which was a 65 meter step out to the west of the Contention Main Zone and further confirmed the Company’s thesis that gold mineralization continues in that direction. 

 

Simon details the consistency of the mineralization and explains why it’s not yet time to release a resource estimate. We conclude with insights into upcoming results from the Westside and South Extension areas.

 

Please email me any questions you have for Simon. My email address is Fleck@kereport.com

 

Click here to visit the Aztec Minerals website.

 

Figure 1: Tombstone 2024 RC Drilling Plan Completed to Date

 

Leave a Reply

Your email address will not be published. Required fields are marked *