Aztec Minerals – First Holes From 2024 Drill Program At Tombstone Project, Drill Program Expanded 50%
Simon Dyakowski, President and CEO of Aztec Minerals (TSX.V:AZT – OTCQB:AZZTF) joins me to discuss the first two drill hole results from this year’s expanded drill program at the Tombstone Project, in Arizona. The program is focused on stepping out around the Contention open Pit target and testing the Westside area. See Figure 1, from the November 21st news release, posted below.
Key highlights include hole 1 (DH TR24-01) which intersected 0.75 g/t gold equivalent over 103 meters.
I have Simon outline the expansion of the drill program, to 3,000 meters from 2,000 meters, and where the drilling will be focused. I also ask about turnaround time for holes already drilled and when investors can expect to see additional results.
Please email me any questions you have for Simon. My email address is Fleck@kereport.com.
Click here to visit the Aztec Minerals website.
Figure 1: Tombstone 2024 RC Drilling Plan Completed to Date
Leave a Reply