Banyan Gold – 2024 Exploration and Technical Program Overview At The 7Million Oz AurMac Project, Yukon
Tara Christie, President and CEO of Banyan Gold (TSX.V:BYN – OTCQB:BYAGF) joins me to provide more information on this year’s exploration program at the AurMac Gold Project, in the Tombstone Belt in the Yukon.
The Company is planing up to 5,000 meters of drilling focused at the higher-grade areas on the Powerline Deposit and expanding the resources at the Powerline and Airstrip Deposits. The Airstrip Deposit was last drilled in 2020 and has a higher average grade than the larger Powerline Deposit.
The total resource was updated last year, now at 7million ounce of gold, inferred. The work outside of drilling will also continue to de-risk the resource through metallurgical work, environmental baseline studies and internal scoping level engineering.
If you have any follow up questions for Tara please email me at Fleck@kereport.com.
Click here to visit the Banyan Gold website to learn more about the Company.