Korelin Economics Report

Blackrock Silver – Key Growth Metrics Reviewing The Updated Resource Estimate At The Tonopah West Silver Gold Project

Andrew Pollard, President and CEO of Blackrock Silver (TSX.V:BRC – OTCQX:BKRRF), joins us to outline the key takeaway results for its updated mineral resource estimate for its 100% controlled Tonopah West Project, located in the Walker Lane trend of Western Nevada. 

 

HIGHLIGHTS:

 

 

The primary goal moving forward will be to tie the 3 resource areas at DPB, Victor, and the Northwest Step Out targets together into one larger system, by drilling in between these 3 zones. 

 

We wrap up mentioning the other value drivers of the company’s other 2 projects.  Next year there will be more drilling following up on the prior bonanza-grade gold and silver discovery at the Silver Cloud Project.  Then he mentions continuing to follow along with the progress and exploration work from the Tonopah North Lithium Project in Nevada, where their option partners,  Tearlach Resources (TSX.V: TEA – OTC: TELHF), have released promising drill results this year, intersecting significant grade and thickness of lithium mineralization in every drill hole.

 

If you have any follow up questions for Andrew regarding Blackrock Silver, then please email us at Fleck@kereport.com or  Shad@kereport.com.

 

 

.

Click here to visit the Blackrock Silver website to read over the recent news we discussed.

Exit mobile version