On August 2nd Torq Resources (TSX.V:TORQ – OTCQX:TRBMF) announced the first two drill holes at the Cerro del Medio target in the Company’s inaugural drill program at the Santa Cecilia Project, in Chile. These two hole were drilled 700 meters apart with Hole 2 yielding the best result of 557 metres of 0.38 g/t gold, 0.23% copper and 56 ppm molybdenum.
Shawn Wallace, Executive Chairman and Michael Henrichson, Chief Geologist at Torq Resources joins us to discuss these results. We outline these early results and how the Company is planning to follow up with future drilling. Refer to Figure 3 from the news release posted below to get a better understanding of how these holes relate to past drilling.
Please email us with any follow up questions for the team over at Torq. Our email addresses are Fleck@kereport.com and Shad@kereport.com.
Click here to read over the news release reporting the drill results.