Simon Dyakowski, President and CEO of Aztec Minerals (TSX.V:AZT – OTCQB:AZZTF) joins us to recap the final drill results from this year’s drill program at the Tombstone Project in Arizona. The final 3 holes of the program were released on June 15th.
We summarize these results and the full program at Tombstone. We have Simon provide more information on Holes 6 and 7 as these were drilled in newer areas. Hole 6 in a gap zone between the Main (North) and Grand Central (South) pits, and Hole 7 in the northern part of the target area. These area along with a couple others Simon outlines will be followed up in a future drill program.
If you have any follow up questions for Simon please email us at Fleck@kereport.com or Shad@kereport.com.
Click here to visit the Aztec Minerals website and read over the recent news releases.