Minimize

Welcome!

Heliostar Metals – Drill Results From Ana Paula Intersect 46.0 m Grading 13.4 g/t gold Within 129.2m Grading 6.0 g/t Gold

Cory
June 15, 2023

Charles Funk, President and CEO of Heliostar Metals (TSX.V:HSTR – OTCQX:HSTXF) joins me to recap the latest round of drill results at the Ana Paula Project in Mexico. the focus of the program is on the high-grade panel both to infill gaps from past drilling and assess mineralization around the high-grade panel. 4 holes were in the release on June 12th.

 

I first have Charles recap the headline hole, 293 that intersected 46.0 meters grading 13.4 g/t gold within 129.2m grading 6.0 g/t gold. We also focus on hole 294 which was drilled above the high-grade gold panel, intersecting 13.95 meters grading 6.4 g/t gold. As the program continues Charles outlines where the drills are targeting moving forward.

 

Please email me with any questions you have for Charles. My email address is Fleck@kereport.com.

 

 

 

 

Click here to visit the Heliostar Metals website to read over the full drill result news release we discussed.