Korelin Economics Report

Torq Resources – Drill Results Expand The Falla 13 Discovery To 800 Meters, At The Margarita Project

On November 28th Torq Resources (TSX.V:TORQ – OTCQB:TRBMF) announced another round of drill results from the Falla 13 Discovery on the Margarita Project in northern Chile. These results expand the copper-gold mineralization to 800 meters.

 

Shawn Wallace, Executive Chairman of Torq Resources and Michael Henrichsen, Chief Geologist join me to recap the phase 2 drill program and the latest results. There are a couple Figures below from the news release for you to follow along. The team is already planning a follow up program at the Falla 13 area as well as to test some new targets.

 

We wrap up with a quick comment on the Santa Cecilia gold-copper Project where field work has begun and drilling will start shortly.

 

If you have any follow up questions for Shawn or Michael please email me at Fleck@kereport.com.

 

 

 

Click here to visit the Torq Resources website to read over the full drill results news release.

 

Figure 1: Illustrates drill highlights from the second phase of RC drilling at the Falla 13 discovery zone.
Figure 4: Illustrates a long-section along the Falla 13 discovery with a view to the east. Importantly, high-grade mineralization appears to have a flat lying geometry that is generally located between the contact between dacitic volcanic rocks that overlay a diorite and monzodiorite intrusive complex. A second lower structure encountered lower grades within the phase 2 drill program and demonstrates the potential for parallel structures to be mineralized.
Exit mobile version