Snowline Gold – Step Out Drill Results From The Valley Zone Intersecting 1.45 g/t Gold Over 285.2 m, Including 2.48 g/t Gold Over 128.2 m From Bedrock Surface
Cory
November 29, 2022
Scott Berdahl, CEO of Snowline Gold (CSE:SGD – OTQCQB:SNWGF) joins us to recap the November 15th news release reporting 2 drill results from the Valley Zone on the Rogue Project, in Yukon. Here is a summary of the 2 holes released.
- Hole V-22-014 returned 1.45 g/t Au over 285.2 m, including 2.48 g/t Au over 128.2 m from bedrock surface in 160 m step-out from previous holes
- Full results in for V-22-007 returned 1.89 g/t Au over 410.0 m (entire length in mineralization), including previously announced 3.24 g/t Au over 146.0 m
We have Scott recap these results and explain what it means for the overall Valley Zone. We also look ahead to the remaining holes still at the assay lab that amount to 80%, or 10,530 meters. Take a look at the cross section and Valley Zone plan map below to follow along with our conversation with Scott.
If you have any follow up questions for Scott please email us at Fleck@kereport.com and Shad@kereport.com.
Click here to visit the Snowline Gold website and read over the recent news.