Jim Greig, President and CEO of Benchmark Metals (TSX.V:BNCH – OTCQX:BNCHF) joins us to recap the recent news highlighting initial drill results from the Connector Zone on the Lawyers Gold and Silver Project, in the Golden Horseshoe of northern British Columbia. The Connector Zone is between the Cliffs Creek Deposit (a 2.1milllion oz gold resource) and the Dukes Ridge Deposit (a 109k oz gold deposit). Some of the highlighted intercepts include 41meters of 1.69g/t Gold Equivalent and 10.67meters of 5.72g/t Gold Equivalent.
We have Jim outline the strategy behind drilling the Connector Zone, focused on mine planning and adding high-margin ounces to the 2.9million ounce resource (2.1million oz indicated and over 800,000 oz inferred). We also discuss the continued drilling, part of the 100,000 meter drill program, and general timing for the upcoming PEA.
If you have any follow up questions for Jim please email us at either Fleck@kereport.com or Shad@kereport.com.
Click here to read over the full news release on the Connector Zone drill results.