Korelin Economics Report

Volcanic Gold – Exploration Update On The Holly Project

Simon Ridgeway, President and CEO of Volcanic Gold (TSX.V:VG – OTC:VLMZF) joins us to recap the exploration news from October 5th highlighting high-grade gold & silver drill intercepts from the La Peña vein on the Holly Project, in Guatemala. Some of the results include hole HDD-21-019 with 1.53m @ 191.8 g/t Au and 539 g/t Ag, and hole HDD-21-017 with 8.83m @ 8.81 g/t Au and 355 g/t Ag.

We have Simon discuss the other holes at Holly that are being drilled at depth or pending release from the assay lab, and what the ongoing exploration strategy will be moving forward. We wrap up discussing the drill rig moving over to the Banderas Project, to target 7-8 holes to test the M28 and Pyramid Hill targets.

Please email us with any follow up questions for Simon on Volcanic Gold at either fleck@kereport.com or shad@kereport.com.

http://www.kereport.com/wp-content/uploads/2021-10-06-Simon-Ridgeway-Volcanic-Gold-Mines.mp3

Click here to read over the drill results news release we discussed.

Exit mobile version