Korelin Economics Report

Great Bear Resources Exploration Update On the LP Fault Zone, Testing The Gap, And Potential At Depth

Chris Taylor, President and CEO of Great Bear Resources (TSX.V:GBR – OTCQX:GTBAF) joins us for an update on the recent high-grade drill results announced on August 25th from the LP Fault on the Dixie Project, in the Red Lake District in Ontario. We discuss how these results reinforce the continuity of the mineralization at both ends of the drill grid, and that the Company is also encouraged by the continuous mineralization after testing the gap zone between the Central and Discovery areas.  Next Chris discusses the potential of the deposit to grow at depth and comments on the high grade analogs in other deposits being mined at depth in Red Lake.  We wrap with a review of why the wide intercepts of continuous bulk tonnage amenable drill results are every bit as important for scale, as the high grade center of the deposit, for building a potential long-life economical deposit, as they move towards their maiden resource estimate in 2022.

 

Please email us with any follow up questions for Chris regarding Great Bear at either Fleck@kereport.com or  Shad@kereport.com.

http://www.kereport.com/wp-content/uploads/2021-08-25-Chris-Taylor-Great-Bear.mp3

Click here to visit the Great Bear website for a summary of recent news.

Exit mobile version