Korelin Economics Report

GR Silver Mining – A dive into the new Resource Estimate at the Plomosas Project

Marcio Fonseca, President and CEO of GR Silver Mining (TSX.V:GGRSL – OTCQB:GRSLF) joins me to recap the new Resource Estimate that was released yesterday on the Plomosas Project, in Mexico. The resource was announced at 31.3million oz silver equivalent (both indicated and inferred). We focus a lot the historic drill holes that were included to build the resource and some of the near term growth areas to both grow the resource and increase grade. I also have Marcio detail where the drills are turning currently.

If you have any follow up questions for Marcio please email me at Fleck@kereport.com or Shad at Shad@kereport.com.

http://www.kereport.com/wp-content/uploads/2021-08-24-Marcio-Fonseca-GR-Silver-Mining.mp3

Click here to read over the news release outlining the new Resource Estimate.

Figure 1 – Resource Estimation Areas – Plomosas Mine and San Juan Areas(1) (1) New Au-Ag targets of the ongoing Drill Program are shown in black
Exit mobile version