Korelin Economics Report

Calibre Mining – Recapping High grade drill results from the Eastern Borsi Project and strong Q2 financial results

Ryan King, VP of Corporate Development at Calibre Mining (TSX:CXB – OTCQB:CXBMF) joins us for an exploration and operational update.

We start with the high grade drill results at the Eastern Borsi Project that yielded 25g/t Gold over 9.7meters and 39.21g/t Gold over 3.1meters. We discuss how this project, as well as some of the other targets that are being drilled, can be moved into the mine plan and feed the Libertad Mill, which has excess capacity available.

We then recap the Q2 financial results that generated $29.1million from operating activities. We focus on the key operational figures and the forecasts/expectations for the rest of the year.

Please email us with any further questions for Ryan. Our email addresses are Fleck@kereport.com and Shad@kereport.com.

http://www.kereport.com/wp-content/uploads/2021-08-11-Ryan-King-Calibre-Mining.mp3

Click here to visit the Calibre Mining website and read over the Corporate Presentation. Ryan refers the the Libratad Mill Capacity slide which is slide 19.

Exit mobile version