Simon Dyakowski, President and CEO of Aztec Minerals (TSX.V:AZT – OTCQB:AZZTF) joins us to recap the initial drill results from the 20 hole 2,900 meter drill program at the Tombstone Project in Arizona. A total of 5 holes were released with the headline hole #3 yielding 5.71 g/t Gold and 40.5 g/t Silver (6.282 g/t AuEq) over 32.01 meters. We discuss the location of these holes (see the drill map below) and overall goals of this program.
Please email us with any follow up questions for Simon. Our email addresses are Fleck@kereport.com and Shad@kereport.com.