Korelin Economics Report

Gold Mountain Mining – Initial high grade gold results from the 10,000 meter program at the Elk Gold Project and an outlook for the rest of the year

Kevin Smith, CEO of Gold Mountain Mining (TSX.V:GMTN – OTCQB:GMTNF) joins us discuss the recent drill results (announced on June 30th) from the 10,000 meter drill program that is underway at the Company’s Elk Gold Project in BC. These initial results yielded high grade gold intercepts over narrow widths. With the goal to add ounces to the current resource, we have Kevin outline how these results compare to the Phase 1 program that added 216,000 ounces of gold to the resource. We also look ahead to the catalysts for the second half of this year as the Company continues to explore and ramp up production.

If you have any follow up questions for Kevin please us at Fleck@kereport.com or Shad@kereport.com.

http://www.kereport.com/wp-content/uploads/2021-07-01-Kevin-Smith-Gold-Mountain-Mining.mp3

Click here for a summary of the recent news released by Gold Mountain Mining.


Upcoming KE Report Webinars – On Wednesday July 7 @ 10am PDT (1pm EDT) I am featuring Northern Vertex Mining (TSX.V:NEE – OTC:NHVCF). On Thursday July 8th @ 12-noon PDT (3pm EDT) I will be joined by Tombill Mines (TSX.V:TBLL). Be sure to click the links below to sign up for free and have first access to the recording. Please send any questions you have for either company to Fleck@kereport.com

Click here to register for the Northern Vertex Mining webinar on Wednesday July 7th @ 10am PDT.

Click here to register for the Tombill Mines webinar on Thursday July 8th @ 12-noon PDT.

Exit mobile version