Click download link to listen on this device: Download Show
Arturo joins us to elaborate on the recent resource estimate from Gavilanes and provides us with a production update at the Rosario Mine. Rosario is expected to close out the year cash flow positive and in 2014 the San Felipe property is planned to begin production.