Orex Minerals is pleased to announce today that additional trenching and reconnaissance channel sampling have extended the target for over 1.6 kilometres strike-length on the Impulsoro structures of the Coneto Gold-Silver Project in Durango, Mexico.
Trench Impul-104 yielded an intercept of 1.50 metres (true thickness 1.47 metres) grading Au 28.0 g/t and Ag 5 g/t for a gold-equivalent of 28.1 g/t, or a silver-equivalent of 1,545 g/t.
Reconnaissance channel #329281 yielded an intercept of 0.85 metres (true thickness 0.83 metres) grading Au 0.39 g/t and Ag 452 g/t for a gold-equivalent of 8.61 g/t, or a silver-equivalent of 473 g/t.
A technical committee, with representation of Orex and its project partner Fresnillo plc (LSE:FRES) (“Fresnillo”), is managing the Coneto exploration program.
According to Orex’s President, Gary Cope, “The strike-length of the Impulsora Structures is impressive. Further drilling of this target area is warranted. We look forward to more success on the Coneto Project.”
The complete news release is available on our website. Please visit www.orexminerals.com or contact me direct for further information.
Your comments, questions, are welcome.
Patrice Nazareno, Investor Relations
604-687-8566
patrice.nazareno@
www.orexminerals.com